15 April, 2008

Projects

Category: BC,Knitting,Politics,Work — Moose @ 11:15 pm

I get to go to the Hill tomorrow with my political boss over The Current Project From Heck and listen to one of our appropriators fuss at us for a bit, and then explain why what they did wasn’t good enough (and how they can fix it). Should be an interesting time.

Was very late getting into work, but was worth it, since lateness was caused by attacking BC when we woke up. Definitely worth the 2 hours of leave time, especially since he’s now (hopefully) in the air and on his way to England for the next 10 days.

Just finished skein #2 on BC’s scarf. I suspect, given how tall he is, that it’s going to have to be four skeins instead of the three called for in the pattern. I already have a fourth skein on hand, just in case, so it’ll be easy enough to add it in. Of late I’ve loosened up on how tightly I’ve been pulling the stitches, with the result that it’s flown along a lot more quickly than it had been. Mom was saying something the other day about how her mother is a pretty tight knitter, so her patterns always needed to be increased to make up for it. I haven’t noticed that much of a difference in the finished stitches, but it has been easier to knit into.

Picked up more yarn and another circular needle this past weekend to attempt the matching hat pattern to go with the scarf.

After the Hill visit I’m going to be back into full-on writing mode for The Project. Based on comments from the #2 attorney in our office we’re going to have to flip the memo back around to the pattern I had originally set out for the thing (*smirk*), and tighten it up considerably. I know I can get the flow into place, but the tightening is going to be a bear. Too bad it’s not as easy as knitting.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.